ROOQ ELECTRIC successfully operates power distribution project in Kyrgyzstan

ROOQ ELECTRIC GROUP CO., LTD has achieved another success by successfully completing the 2*40MVA 110/6KV power distribution project in Kyrgyzstan and putting it into operation smoothly. This achievement not only demonstrates the outstanding capabilities of ROOQ Electrical Group in the field of power engineering, but also provides strong support for the construction of power infrastructure in Kyrgyzstan.

As an important country in Central Asia, Kyrgyzstan has rapid economic development and increasing demand for electricity. In order to meet the growing power demand in the region, ROOQ Electrical Group undertook this major power distribution project. The smooth implementation of this project will greatly enhance the local power supply capacity and help economic development.

Project Details

The power distribution project includes two 40MVA transformer groups with an operating voltage of 110/6KV. The main work of the project includes the installation of transformers, the construction of distribution lines and the improvement of related supporting facilities. ROOQ Electrical Group uses the most advanced technology and equipment to ensure the efficiency and reliability of the project.

Main Equipment

  • Transformer: An energy-efficient 40MVA transformer with excellent load performance and long life is used.
  • Distribution Line: 110KV and 6KV distribution lines are built to ensure stable and efficient power transmission.
  • Control System: Equipped with an intelligent control system, remote monitoring and management are realized.

Project Implementation

The professional team of ROOQ Electrical Group overcame various challenges during the implementation of the project and ensured the smooth progress of the project. The project team conducted detailed field surveys and planning to ensure that every link meets the highest standards. From the transportation, installation to commissioning of the equipment, every step is strictly controlled by professionals.

On-site Installation
The team members of ROOQ Electrical Group carried out efficient equipment installation and commissioning on site. The team members not only have rich field installation experience, but also have received rigorous technical training to ensure that every task can be completed with high quality.

Commissioning and operation
After the equipment was installed, ROOQ Electrical Group carried out comprehensive commissioning to ensure the stable operation of the system. The project team conducted a detailed inspection and test of each device to ensure that the project can provide stable and efficient power after it is put into operation.

Project Significance

The successful operation of this power distribution project not only improves Kyrgyzstan’s power supply capacity, but also provides important support for local economic development. Through this project, ROOQ Electric Group has further consolidated its leading position in the international power engineering market.

After the project was completed, ROOQ Electric Group received high praise from Kyrgyzstan customers. The customer said that the professionalism and efficient execution shown by ROOQ Electric Group during the project implementation were impressive, and hoped to have more cooperation opportunities in the future.

ROOQ ELECTRIC GROUP CO., LTD will continue to uphold the concept of “quality first, customer first”, continuously improve its technical level and service capabilities, and provide more high-quality power solutions for global customers. The successful implementation of the Kyrgyzstan project has laid a solid foundation for the company’s future expansion in the Central Asian market.

Good!Share this case: