ROOQ Electric Group successfully operates Shihezi 16*2.5MVA project

ROOQ Electric Group Co., Ltd. announced that its 16*2.5MVA power distribution project in Shihezi, Xinjiang was successfully put into operation. The successful completion of this project not only improved the power supply capacity of the local power grid, but also demonstrated ROOQ’s technical strength and project management capabilities in large-scale power projects.

Shihezi City is located in the Xinjiang Uygur Autonomous Region and is one of the important cities of the Xinjiang Production and Construction Corps. With the development of the city and the advancement of industrialization, the demand for power supply is increasing. To this end, the local government decided to upgrade the distribution system to ensure stable power supply in cities and industrial areas.

Introduction to ROOQ Electric Group

Founded in 2008, ROOQ Electric Group is a high-tech enterprise specializing in the research and development, production and sales of electrical equipment such as power transformers, high and low voltage switchgear. The company has a strong technical R&D team and advanced production equipment. Its products are widely used in major engineering projects at home and abroad, and have obtained international certifications such as ISO 9001.

Project Implementation

In the Shihezi 16*2.5MVA power distribution project, ROOQ Electric Group was responsible for providing and installing high and low voltage power distribution equipment, including transformers, switchgear, cables, etc. During the implementation process, the project team strictly followed international standards and industry specifications to ensure the quality and safety of every link.

Main Equipment and Technology

  1. High Voltage Switchgear: Adopts advanced vacuum circuit breaker technology, with high reliability and long life.
  2. Low Voltage Distribution Cabinet: Modular design, easy to install and maintain.
  3. Transformer: High efficiency and energy saving, in line with national energy conservation and environmental protection requirements.

Project Challenges and Solutions

During the project implementation, the ROOQ team faced multiple challenges, including:

  • Complex construction environment: The climatic conditions in the Shihezi area are complex, and the influence of high temperature and dust weather must be overcome during construction.
  • High standard safety requirements: The safety of the power system is of vital importance, and the ROOQ team operates in strict accordance with safety specifications.

Through meticulous project management and efficient teamwork, ROOQ successfully overcame these challenges to ensure that the project was delivered on time and ran smoothly.

Project Significance

The successful operation of the Shihezi 16*2.5MVA distribution project not only improves the power supply capacity of the local power grid, but also provides a solid foundation for the further development of Shihezi City. The completion of this project demonstrates the comprehensive strength and professional level of ROOQ Electric Group in large-scale power projects.

The successful operation of the Shihezi 16*2.5MVA project once again proves the outstanding strength and international competitiveness of ROOQ Electric Group in the field of power equipment. In the future, ROOQ will continue to work hard to promote the development and progress of the power industry.

ROOQ Electric Group will continue to uphold the concept of technological innovation and customer first, continuously improve product quality and service level, actively participate in more major engineering projects at home and abroad, and provide high-quality power solutions for global customers.