Cambodia has experienced rapid economic development in recent years, and the demand for electricity has increased significantly. To meet this demand, the Cambodian government and several international partners have jointly promoted a number of power infrastructure construction projects. ROOQ Electrical Group Co., Ltd., with its rich experience and technical advantages in the field of electrical equipment manufacturing, successfully won the bid and successfully completed the Cambodia 6.3MVA power distribution project.
Project Overview
This 6.3MVA power distribution project is an important part of Cambodia’s power system, aiming to improve the stability and reliability of local power supply. The project mainly includes the following:
- Substation construction: ROOQ Electrical is responsible for providing and installing a substation with a capacity of 6.3MVA to meet the electricity demand in the surrounding areas.
- Distribution system: Equipped with advanced distribution equipment and intelligent control systems to achieve efficient distribution and remote monitoring of electricity.
- Safety assurance: Multiple protection devices are set up to ensure the safety and reliability of the distribution system under various operating conditions.
Project implementation
In order to ensure the smooth implementation of the project, ROOQ Electric has taken a number of measures throughout the process:
- Project planning: Work closely with the local power department of Cambodia to develop detailed project planning and implementation plans to ensure the smooth connection of each link.
- Equipment manufacturing: Produce distribution equipment in strict accordance with international standards to ensure the high quality and high performance of the equipment.
- Installation and commissioning: Send a professional technical team to the site to install and commission the equipment to ensure that the distribution system is put into operation on time.
Project operation
Since the project was completed and put into operation, the 6.3MVA distribution system has performed well in actual operation, mainly reflected in the following aspects:
- Stable power supply: The distribution system operates stably, successfully solves the local power shortage problem, and improves the reliability of power supply.
- Efficient management: The intelligent control system realizes remote monitoring and management, improves the operating efficiency and maintenance convenience of the distribution system.
- Safe operation: Multiple protection devices effectively prevent the occurrence of faults such as short circuit and overload, ensuring the safe operation of the distribution system.
Customer Feedback
The local government and power department of Cambodia highly praised ROOQ Electric’s performance in this project, believing that the power distribution equipment and solutions provided by ROOQ Electric are not only technologically advanced, but also provide good services, making important contributions to the construction of local power infrastructure.
The successful operation of ROOQ Electric Group Co., Ltd. in the 6.3MVA power distribution project in Cambodia once again proves its leading position and outstanding strength in the international power equipment market. Through this project, ROOQ Electric not only provides strong support for Cambodia’s power development, but also further enhances its brand influence in the global market.
In the future, ROOQ Electric will continue to uphold the corporate philosophy of “innovation, quality, and service”, actively participate in more international projects, provide high-quality electrical solutions to global customers, and promote the development of the global power industry.